Industrial Engineer · phase 3 of 16

Online Edit

Program change made while the controller remains connected and, where supported, continues running.

The Explain card

Plain English
An online edit changes the program while the controller stays connected and, on most platforms, keeps running. The edit is tested on the live machine and then accepted or cancelled.
Example
A timer preset is too short and parts jam. The engineer changes the value online, watches two cycles run clean, and assembles the edit into the running program.
Why it matters
Production keeps running, which is why the plant loves it. The same edit that fixes a jam can also start a motor the moment it is accepted, so know what the rung will do before you finalize it.
Hook
Surgery on a patient who is still working.

Where it sits in the deck

Phase 3: PLC Program Organization and Execution

How the logic is arranged and how the scan actually runs it, which is the difference between code that works and code that works every time.